The roof is on and the electricians have begun.

Paul Danson Imagineering roof contactors have been busy at work, the insulation is in and the roof has been lined with ash felt and battening ready for our antique corrugated tin to be laid on top. The York stone paving is almost laid for the alfresco dining area, and we think that it looks fantastic.
The plywood cladding has been applied to the internal steel frame in preparation for the aged timber to be installed. The upper feature gallery has been boarded and creating different voids within the space. The electricians are well on their way with the first fix electrics, installing all provisions for the light fittings along with the intelligent sound system.

Electrical discussions take place

Wiring hangs down ready for the light fittings

Hard landscaper at work



The Oast House exterior view