The plywood cladding has been applied to the internal steel frame in preparation for the aged timber to be installed. The upper feature gallery has been boarded and creating different voids within the space. The electricians are well on their way with the first fix electrics, installing all provisions for the light fittings along with the intelligent sound system.
Electrical discussions take place |
Wiring hangs down ready for the light fittings |
Hard landscaper at work |
The Oast House exterior view |
No comments:
Post a Comment